Tuesday, July 14, 2015

Site Restart

Air conditioner was fixed yesterday, let run overnight for stability.

Restarted all chem instruments approximately 10am CDT.

Monday, July 13, 2015

Site Shutdown due to Air Conditioner Failure

Shut down the site around 9am CDT due to ac failure. Temp was 117 degrees before shutdown. Opened all doors and let trailer cool down to ambient air temp before leaving.

Thursday, July 9, 2015

Site Check

All OK

Replaced capillaries in ozone thermo that is being tested to return to UHCC